Whanganui Prison Sewer Project Upgrade

Whanganui Prison Sewer Project Upgrade

Client: Fulton Hogan

What We Did

DMK Contracting was engaged by Fulton Hogan to undertake specialist wastewater infrastructure works as part of the Whanganui Prison Sewer Project Upgrade.

Across the 9 km sewer main project, DMK was responsible for the installation of scour valve chambers, air valve chambers and flushing points. Chamber installations ranged from approximately 1.8 m to 5.5 m deep, requiring careful planning and safe excavation practices throughout the eight-month programme.

Due to the depth of the installations, trench shields were used for the majority of the chamber works to provide safe excavation support. Shoring was also required at several locations where groundwater and ground conditions presented additional challenges.

Dewatering was carried out at each installation using bird’s nest systems to manage groundwater within the trenches and maintain suitable working conditions. DMK’s team also completed all electrofusion (EF) coupler welds associated with each chamber installation.

The project was delivered by DMK over an eight-month period as part of the wider 9 km sewer main upgrade.

Concrete manhole surrounded by compacted gravel in a roadside excavation.
Inside a concrete manhole, showing yellow access steps, pipework and standing water at the base.

The Solution


  • Scour valve chamber installation

  • Air valve chamber installation

  • Flushing point installation

  • Chamber installations from 1.8 m to 5.5 m deep

  • EF coupler welding at each chamber

  • Excavation support and shoring

  • Groundwater management and trench dewatering

Outcome

DMK completed its scope over eight months as part of the wider 9 km Whanganui Prison sewer main upgrade, installing scour valve chambers, air valve chambers and flushing points at depths of up to 5.5 metres.

Project Gallery

Two workers backfilling around a concrete manhole in a fenced roadside excavation.
Concrete manhole surrounded by compacted gravel in a roadside excavation.
Inside a concrete manhole, showing yellow access steps, pipework and standing water at the base.
Services

Water Infrastructure

Wastewater Infrastructure

Stormwater Infrastructure

Pipeline Renewals & Maintenance

PE Pipe Installation & Welding

Contact

PH 027 202 5142

E info@dmkcontracting.co.nz

F @DMKcontracting

© 2026 DMK Contracting All rights reserved.