What We Did

DMK Contracting was engaged by Fulton Hogan to undertake water infrastructure works at the Wastewater Treatment Plant on Rifle Range Road, New Plymouth.

The works included the installation of a new 180 mm PE water main and connection into the existing network, requiring modifications to the existing asbestos cement (AC) pipeline.

To complete the connection between the new PE infrastructure and existing network, DMK removed approximately four metres of the existing AC main before completing the new tie-in.

As part of the wider works, the team was also engaged to chlorinate the site’s water tank, which has an approximate area of 500 m².

The project demonstrated DMK’s capability across PE water infrastructure, existing network connections and supporting water-system works within an operational treatment facility.



Worker beside pipework suspended over a trench, with yellow-wrapped pipe extending below ground.
Installed above-ground pipework and blue valves beside a road.

The Solution


    • Installation of 180 mm PE water main

  • Connection to the existing water network

  • Removal of approximately 4 m of existing AC pipe

  • Water main tie-in works

  • Water tank chlorination

  • Works within an operational wastewater treatment facility

Outcome

To complete the connection between the new PE infrastructure and existing network, DMK removed approximately four metres of the existing AC main before completing the new tie-in.

Working within an operational wastewater treatment facility required the new infrastructure to be carefully integrated with the existing network. As part of the wider works, the team also completed chlorination of the site’s water tank.

Project Gallery

Above-ground pipework with blue valves and curved connections over an excavated area.
Worker beside pipework suspended over a trench, with yellow-wrapped pipe extending below ground.
Installed above-ground pipework and blue valves beside a road.
Above-ground pipe assembly with blue valves, supported on concrete pads within an excavated area.
Services

Water Infrastructure

Wastewater Infrastructure

Stormwater Infrastructure

Pipeline Renewals & Maintenance

PE Pipe Installation & Welding

Contact

PH 027 202 5142

E info@dmkcontracting.co.nz

F @DMKcontracting

© 2026 DMK Contracting All rights reserved.