What We Did
DMK Contracting was engaged by Aaron George Builders to deliver the underground services for the Franklyn Park residential development on Towai Street, supporting a new 24-lot subdivision.
The team completed the installation of the development’s stormwater, wastewater and water infrastructure. Works included 150 mm and 100 mm PVC sewer mains, 150 mm PVC water mains, 63 mm PE pipework and 24 individual 25 mm service laterals.
DMK also installed 20 × 1050 mm manholes across the sewer and stormwater networks, along with 375 mm OD concrete stormwater pipe.
The project involved the coordinated delivery of the subdivision’s core three-waters infrastructure, providing the essential underground services required for the development of all 24 residential sites.

The Solution
Stormwater, wastewater and water infrastructure
150 mm and 100 mm PVC sewer mains
150 mm PVC water main
63 mm PE pipework
24 × 25 mm service laterals
20 × 1050 mm sewer and stormwater manholes
375 mm OD concrete stormwater pipe
Outcome
DMK delivered the underground three-waters infrastructure required to service the new 24-lot residential development, coordinating the installation of water, wastewater and stormwater networks across the site.
The works brought together multiple pipe systems, service laterals and manhole installations as part of a coordinated infrastructure package, providing the essential underground services required for the development of all 24 residential sites.