What We Did
DMK Contracting was engaged by Drillco Ltd to complete specialist water infrastructure works for the Crown PRV Station in Palmerston North.
The project involved the installation of a new pressure reducing valve (PRV) station and connection into the existing 250 mm asbestos cement (AC) water main.
The works required careful integration with the existing network to complete the new PRV station and associated connection works as part of Palmerston North’s water infrastructure.


The Solution
Installation of PRV station
Connection to existing water infrastructure
Tie-in to 250 mm AC water main
Specialist water network works
Outcome
The works involved installing the new pressure reducing valve station and integrating it with the existing water network through a connection to the 250 mm AC water main.
The project added to DMK’s experience delivering specialist water infrastructure and completing connections into existing networks.